Gas Furnaces Michigan City, Indiana
Installation Details:
EQUIPMENT:
Armstrong A95UH1E070B12s-06; Serial: 5921M16191 Series High Efficiency Furnace
- 95% AFUE Efficiency Rating
- Stainless Steel Heat Exchangers
Armstrong 4SCU13LB136P-6; Serial: 1622E10821 Series Outdoor Condensing Unit
- 13 SEER Efficiency Rating (14 SEER As A Packaged System)
ADP 36BXCA; Serial: 7122E226001 Series Indoor Evaporator Coil
Little Giant Condensate Pump
Honeywell Focus Pro 5000 Non-programmable Thermostat
SCOPE OF WORK:
1. Remove And Dispose Of The Existing Furnace, Condensing Unit, Line-set, And Evaporator Coil.
2. Provide And Install The New Furnace And Evaporator Coil In The Same Location Adapting To The Existing Supply Air Duct Work.
3. Provide And Install A New Custom Built Return Air Filter Boot And Duct Transition Adapting To The New Furnace.
4. Adapt The New Furnace To The Existing Gas Piping And Electrical Circuit.
- Install A New Shut Gas Shut Off For The Water Heater.
5. Provide And Install New PVC Intake And Exhaust Piping Through The Side Wall Of The Home.
6. Provide And Install The New Outdoor Condensing Unit In The Same Location On A Field Supplied Composite Pad.
7. Adapt The New Condensing Unit To The Existing Electrical Circuit And Disconnect Switch Providing A New Electrical Whip.
8. Provide And Install New Copper Refrigeration Piping From The Indoor Evaporator Coil To The Outdoor Condensing Unit.
9. Install A New Condensate Pump And Drainage Piping From The New Furnace And Evaporator Coil Terminating To The Utility Sink.
10. Provide And Install A New Honeywell Focus Pro 5000 Non Programmable Thermostat In The Same Location As The Existing Thermostat.
11. Start The New Equipment And Check System Operation.
MICHIGAN CITY, IN
07-28-2022
Gas Furnaces Michigan City, Indiana
SCOPE OF WORK:
1. Remove And Dispose Of The Existing Furnace, Outdoor Condensing Unit And Indoor Coil.
2. Install The New Furnace And Indoor Coil In The Same Location Adapting To The Existing Supply & Return Air Duct Work.
3. Adapt The New Furnace And Condensing Unit To The Existing Electric Circuits, Gas And Vent Piping.
4. Install One WIFI Thermostat On The Dining Area Main Floor Furnace And Air Conditioning System.
5. Install One WIFI Thermostat For The Bedroom Zone Served By The Crawl Space Furnace And Air Conditioner System.
6. Replace The Four Honeywell Zone Dampers On The Crawl Space Duct System.
7. Start The New Equipment And Check System Operation.
Michigan City, IN
04-20-2022
Gas Furnaces Michigan City, Indiana
Armstrong Furnace Model A95UH1E070B12S-06; Serial: 5921k09767 - 95% Efficiency Rating With Stainless Steel Heat Exchangers
Little Giant Condensate Pump
New High Efficiency Air Filter Cabinet
Honeywell 5000 Series Non-programmable Thermostat
SCOPE OF WORK:
1. Remove And Dispose Of The Existing Furnace.
2. Install The New Furnace In The Same Location Adapting To The Existing Supply & Return Air Duct Work.
3. Adapt The New Furnace To The Existing Electric Circuit, Vent Piping And Gas Piping
4. Install The New Thermostat In The Same Location As The Existing Control.
5. Start The New Equipment And Check System Operation.
Michigan City, IN
12-02-2021
Gas Furnaces Michigan City, Indiana
Installation Details:
EQUIPMENT:
Armstrong Model: A95UH1E070B12S-06; Serial: 5921E01686 Series High Efficiency Furnace
- 95% AFUE Efficiency Rating
- Single Stage Heat Operation
- Stainless Steel Heat Exchanger
- Multi-speed High Efficiency Blower Motor
Armstrong Model: 4SCU13LB130P-3; Serial: 1621A09553 Series Outdoor Condensing Unit
- 13 SEER Efficiency Rating
- Louvered Jacket Coil Guard Protection
ADP Model: 36BXCA; Serial: 7121F14579 Series Indoor Evaporator Coil
Honeywell Focus Pro 5000 Non-programmable Thermostat
SCOPE OF WORK:
1. Remove And Dispose Of Existing Furnace, Condensing Unit, Line-set, Condensate Drain Lines And Evaporator Coil.
2. Provide And Install The New Furnace And Evaporator Coil In The Same Location Adapting To The Existing Supply & Return Air Duct Work.
3. Adapt The New Furnace To The Existing Gas And Electrical Circuits Providing A New Outlet/switch Combo.
4. Adapt The New Furnace To The Existing Vent Piping.
5. Provide And Install The New Outdoor Condensing Unit In The Same Location On A New Composite Equipment Pad.
6. Adapt The New Condensing Unit To The Existing Electrical Circuit And Service Disconnect With A Field Provided Electrical Whip.
7. Provide And Install New Copper Refrigeration Piping From The Indoor Evaporator Coil To The Outdoor Condensing Unit.
8. Install New Condensate Drainage Piping From The New Furnace & Evaporator Coil Terminating To The Nearby Floor Drain.
9. Provide And Install A New Honeywell Focus Pro 5000 Non-programmable Thermostat In The Same Location As The Existing Thermostat.
10. Start The New Equipment And Check System Operation.
MICHIGAN CITY, IN
08-13-2021
Gas Furnaces Michigan City, Indiana
Installation Details:
EQUIPMENT:
Armstrong A95UH1E110C20S-07; Serial: 5921c03636 Series High Efficiency Furnace
- 95% AFUE Efficiency Rating
- Single Stage Heat Operation
- Stainless Steel Heat Exchanger
- Multi-speed High Efficiency Blower Motor
Armstrong 4SCU13LB160P-3; Serial: 1620f15368 Series Outdoor Condensing Unit
- 13 SEER Efficiency Rating
- Louvered Jacket Coil Guard Protection
ADP 60CXCA; Serial 7121f12153 Series Indoor Evaporator Coil
Honeywell Focus Pro 5000 Non-programmable Thermostat
SCOPE OF WORK:
1. Remove And Dispose Of Existing Furnace, Condensing Unit, Line-set, Condensate Drain Lines And Evaporator Coil.
- Removal Of The Dryer Will Be Necessary To Gain Access To The Equipment.
2. Provide And Install The New Furnace And Evaporator Coil In The Same Location Adapting To The Existing Supply & Return Air Duct Work.
- Re-install The Existing Humidifier.
3. Adapt The New Furnace To The Existing Gas And Electrical Circuits Providing A New Outlet/switch Combo.
4. Adapt The New Furnace To The Existing Vent Piping.
5. Provide And Install The New Outdoor Condensing Unit In The Same Location On A New Composite Equipment Pad.
6. Adapt The New Condensing Unit To The Existing Electrical Circuit And Service Disconnect With A Field Provided Electrical Whip.
7. Provide And Install New Copper Refrigeration Piping From The Indoor Evaporator Coil To The Outdoor Condensing Unit.
8. Install A New Condensate Drainage Piping From The New Furnace & Evaporator Coil Terminating To The Nearby Floor Drain.
9. Provide And Install A New Honeywell Focus Pro 5000 Non-programmable Thermostat In The Same Location As The Existing Thermostat.
10. Start The New Equipment And Check System Operation.
- Re-install The Dryer In The Same Orientation.
MICHIGAN CITY, IN
08-06-2021
Gas Furnaces Michigan City, Indiana
Armstrong MODEL: A80DF1E090B16-03; Serial: 5920D06508 Series Mid Efficiency Furnace
- 80% AFUE Efficiency Rating
- Single Stage Heat Operation
SCOPE OF WORK:
1. Remove And Dispose Of The Existing Furnace.
2. Provide And Install The New Furnace In The Same Location Adapting To The Existing Supply & Return Air Duct Work.
3. Adapt The New Furnace To The Existing Gas And Electrical Circuits.
4. Adapt The New Furnace To The Existing Exhaust Vent Piping.
5. Install Client Provided Wifi Thermostat And Replace The Control Wiring. Set New Thermostat Up With Clients Smart Device.
NOTE: Dye Plumbing & Heating Offers No Labor Or Material Warranties For Client Provided Materials.
6. Start The New Equipment And Check System Operation.
Michigan City, IN
11-03-2020