Bathroom and Kitchen Work

Dye Plumbing & Heatingstarstarstarstarstar4.9 / 5

375 Total Reviews /files/dye-logo-250-130.jpg219-362-6251$1600 Lake Street, LaPorte IN

Bathroom And Kitchen Work La Porte, Indiana

Dye Plumbing & Heating specializes in the installation and service of the best plumbing accessories available in La Porte, IN. Examples of these systems include:

  • Backflow preventers
  • Ejector pumps
  • Grey water systems
  • Garbage disposals
  • Hose bibs and outside faucets
  • Hot water dispensers
  • Hot water re-circulation systems
  • Point of use water filters
  • Pressure regulators
  • Rain water collection systems
If you need plumbing accessories in La Porte, IN for your home or business call Dye Plumbing & Heating today.

Get Your Quote Today



Dye Plumbing & Heating Bathroom And Kitchen Work La Porte, Indiana



Gallery of work For Bathroom and Kitchen Work La Porte, Indiana


Recent Bathroom And Kitchen Work La Porte, Indiana by Dye Plumbing & Heating

Bathroom And Kitchen Work La Porte, Indiana
Echnician Invoice Notes: Upon Arrival Inspected Basement Fixtures And Found Newly Installed Bathtub With No P Trap Hooked Directly To Masserating Pump, See Photos. Did Not Have Any Foul Odors Stemming From Tub At This Time. Did Find De Humidifier That Was Running With A Very Foul Odor. Turned Off Dehumidifier And Observed Odor Dissipate Immediately. Inspected All Traps And Observed Them Full. Client Will Leave De Humidifier Off And Locate With Better Accuracy Odor If It Returns.
La Porte, IN
02-07-2024

Bathroom And Kitchen Work La Porte, Indiana
Estimate
La Porte, IN
02-07-2024

Bathroom And Kitchen Work La Porte, Indiana
Estimate
La Porte, IN
02-07-2024

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Upon Arrival Found Well Tank Switch Short Cycling And Well Tank Failed. Installed New Well Mate 9 Tank , New Switch, Pressure Gage, Pressure Relief Valve, And Boiler Drain. Re Attached To Existing 3/4” Cpvc Piping And Existing 1” Pvc Well Piping. Pressurized And Set Switch To 60 40. No Leaks Or Issues At This Time.
La Porte, IN
01-10-2024

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Installed New Zoeller Sewage Pump In Existing Sewage Pit. Installed New 2” Pvc Quiet Check Valve And Connected Discharge Piping To Existing Sewer Line Inlet. Installed New 2” Vent From Sealed Sewage Pit To Existing 3” Pvc Sewer Line. Installed New Zoeller Sump Pump. Installed New 1 1/2” Pvc Quiet Check Valve And Discharge Piping To Outdoor Termination Due To Pit Serving As Ground Water Elimination System. Installed New 3” Pvc Venting From Existing Powervent Water Heater To Out Door Termination. Installed New Condensation Drain Serving Water Heater Venting. Installed New Delta 1300 Tub/shower Valve In West Bathroom With Chrome Remodel Plate. Installed New Shower Head On Basement Bathroom Shower And New 2” Flapper In Basement Bathroom Toilet. Installed New Wolverine Brass Frost Free Hose Faucet In Rear Of Home.pressurized System And Tested All Repairs And Installations.
La Porte, IN
07-28-2022

Bathroom And Kitchen Work La Porte, Indiana
Scope: Remove And Dispose Of Existing 2 Inch Drain Piping In Crawlspace. Temporarily Remove First Floor Toilet Open Access Under The Three Bay Sink Provide And Install New 3 Inch Drain Piping In The Crawlspace And Extend Into The Basement Area. Provide And Install New 2 Inch Drain Piping From The Three Bay Sink Extending Into The New 3 Inch Drain Line. Extend A New Air Admittance Vent To The Side Of The Three Bay Sink As High As Possible To Allow For Vent Operation. Re-connect Other Existing Drains In The Crawlspace Area To The New 3 Inch Drain Line. Install New 3 Inch Drain Piping And Toilet Flange For The Existing Toilet And Connect All New Drainage To The Existing 3 Inch ABS Piping Before It Enters The Basement Bedroom Wall. Re-set Toilet And Test Installations.
La Porte, IN
04-20-2022

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Investigated And Found Piping From Incoming Water Well To Expansion Well Tank Leaking At High Rate From Connections. Due To Age And Manor Of Existing Well Tank And Piping Recommended Replacement Of Tank And Well Tee. Client Approved. Removed And Disposed Of Existing Tank And Piping. Installed New Wellmate 9 Tank And New Well Tee. Installed New Piping To Adapt To Existing Sch 80 Pvc Piping. Pressurized And Cycled The System. Tested Operation.
La Porte, IN
01-24-2022

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Upon Arrival Stubbed Up 8” Of 1/2” L Type Copper Connecting To Existing 1/2 Pex In Crawl Space With New Stop Valve For New Refrigerator. Hooked Up New Fridge With New Supply Line And Pressurized To Test Operation Of Repairs. Pushed Fridge Into Position. Closed Crawlspace Entrance. No Issues At This Time.
La Porte, IN
01-24-2022

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Upon Arrival Found Recently Installed Garbage Disposal With Limit Reset Switch Tripped. Reset Switch And Observed No Debris In Disposal. Disposal Is Working Properly At This Time With No Issues. Discussed With Client Potential Causes For Reset Switch.
La Porte, IN
12-02-2021

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Upon Arrival Client Requested Kitchen Sink Drain To Be Augered For Maintenance To Prevent Issues. Also Stated Water Not Hot At Bathtub Faucet. Tested And Found Water To Be 90 Degrees Fahrenheit. Inspected Water Heater And Found Unit To Be 14 Yrs Old And Gas Control Valve Set To Fourth Position In Temperature Range Labeled A. Unit Not Recognizing Proper Temperature At Gas Control Valve. Recommend Replacement Of Unit To Client And Provided Estimate For Augering And New Water Heater. Client Approved. Installed New 40 Gallon Bradford White Water M:RG240T6N S:XF48007163. Filled And Cycled Unit. Set Temperature On Gas Control Valve To “hot” Setting. Augered Kitchen Sink Drain From Clean Out In Basement. Ran Full Sink Loads To Test Drain Function.
La Porte, IN
08-24-2021

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Upon Arrival Found Leaking Hose Faucet. Replaced With New Wolverine Brass Hose Faucet. Tested Operation Of Installation By Cycling Large Amounts Of Water With No Issues Outdoors Or At Indoor Connection. No Other Issues At This Time.
La Porte, IN
08-23-2021

Bathroom And Kitchen Work La Porte, Indiana
Shut Down Water Supply, Remove And Dispose Of Existing Well Tank In The Outdoor Access Area Of The Basement. Extend Client Provided PVC Piping From The Existing Incoming Poly Line, Low Along The Access Area And Then Extending Vertically To The Basement Ceiling And Continuing To The New Pressure Tank Location. Connect The New Pressure Tank Piping To The Nearest Existing Piping To Re-supply All Fixtures. Re-use Client's Existing Well Pressure Switch. Provide And Install A New Tank Tee, Pressure Gauge And Safety Relief Valve. Provide And Install A New Ball Valve To Isolate The Home From The New Tank. No Isolation Valves Shall Be Placed Between The Incoming Water Supply And The Well Tank For Safety Purposes. Make Final Electrical Connections For The Well Pump By Installing A Junction Box On The Wall Near The Existing Incoming Supply, Making Connections At The Well Switch, And Reconnecting The New Pump Switch Wire To The Existing Breaker For The Well System In The Fuse Panel. Test Installations
La Porte, IN
08-13-2021

Bathroom And Kitchen Work La Porte, Indiana
Inspected Low Water Pressure Issue And Found Old Water Softener Reducing Flow Drastically. Client Stated Softener Has Not Been Used In A Long Time. Bypassed Softener And Observed Significant Pressure Increase In All Fixtures. Provided Estimate For Repair Of Freeze Damaged Piping To Hose Faucet, Installation Of Client Provided Lavatory, And Repair Of Kitchen Sink Faucet And Drain. Client Approved. Replaced Seats/springs On Delta Kitchen Sink Faucet. Replaced P Trap Serving Kitchen Sink Drain. Removed And Disposed Of Existing Lavatory Cabinet And Top. Installed Clients Lavatory Cabinet And Top With Faucet. Pressurized System And Tested Repairs. Also Provided Estimate For New Water Softener Installation. Client Approved. Will Order Equipment And Schedule To Install. WAter Testing Identified 22 Gpg Hardness Present In Water.
La Porte, IN
07-14-2021

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Investigated Three Dryer Locations For Venting Issue. Found Pool House And Basement Laundry Units To Have Inappropriate Venting Material Used. Replaced Flex Venting With Aluminum Pipe And Elbows From Units To Ridgid Termination In Pool House And Ridgid Venting In Wall Behind Basement Unit. Inspected Dryer In Butlers Kitchen And Found It To Be Ridgid Vented. Documented All Three With Photographs On Work Order.
La Porte, IN
07-08-2021

Bathroom And Kitchen Work La Porte, Indiana
Technician Invoice Notes: Arrived And Found 6” Clean Out Plug Broken. Inspected Pipe Underneath And Found In Proper Shape. Installed New 6” Pvc Clean Out Plug.
La Porte, IN
06-28-2021

©MPN Media & Marketing 2024